Tower Crane Steel Structure Parts : 1.2M Fixing Angle Tower crane fixing angle is connected between tower body and concrete foundation. Usually, the model of fixing angle is based on the tower crane mast section, such as 1.2m s24 mast section, 1.6m L46a1 mast section, 2.0m l68b2 mast section.  In order to install the fixing angles perfectly into concrete, following components are necessary: - 4 pieces of fixing angles and 8 pieces of shafts   -1 template     -1 sighting device The fixing angles and the template can be supplied before the delivery of the crane, because the concrete foundation requires to be prepared in advance.  Detailed information of fixing angles:

Similar

Luffing-Jib Tower Crane 12t
Luffing Tower Crane GHD5522-12
Topless Tower Crane GHP6016-10
Hammer Head Tower Crane GHT5516-6
L68b2 Tower Crane Mast Section Lattice Mast
Zoomlion Tower Crane Mast
Tower Crane Tie Collar Anchorage Frame 2m
2m Fixing Angle for Tower Crane
Adaptor for Tower Crane Mast Section
6T Tower Crane Hoist Hook
Operation Console Joysticks for Tower Crane
HRCV-162A Slewing Controller for Tower Crane

SHEN YANG BAOQUAN BUSINESS CO., LTD

Shenyang Baoquan Business Co., Ltd. established in 2008, is an enterprise engaged in R&D, ma…

Download

Download Current

Copyrights © 2024 alederlight.com All Rights.Reserved .