It is designed for the construction needs of anchoring hole, support hole drainage hole and dangerous rock reinforcement in tunnel.
Functions:
→The whole rig is designed in bulk,which can be places according to your demand on the narrow operation site.
→The single unit is light, can be moved easily, without intense labor.
→The pipe part is equipped with the high -end quick connectors for facilitate the rapid and safe assembly.
→lt has a lower center of gravity and total elevation,which is suitable for the construction of the lower holes.
Technical Parameters: